Built Right Pasadena ConcreteBuilt Right Pasadena Concrete

Garage floor concrete in Pasadena CA - a floor that stands up to daily wear

If your garage floor is cracked, dusty or uneven, we pour a new slab that's finished, jointed and cured on the right schedule.

New gray concrete patio with scored rectangular sections and a textured decorative border beside a house and unfinished wooden posts.

What does a new concrete garage floor involve?

Garage floor concrete in Pasadena, CA means pouring a new slab for your garage, then floating, finishing, jointing and curing it so the top holds up to cars, tools and years of foot traffic. At Built Right Pasadena Concrete, we do this work in Pasadena and the cities around it, and how we handle each of those steps decides how well the surface wears.

Most calls come from someone whose old garage floor has given out, or who's building a garage that needs a floor in the first place. The price moves with the size of the floor, how much old concrete has to come out, how much work the base needs, the finish you choose and what goes on top, and the written estimate puts your own number on all of that. The schedule turns mostly on the permit question and on curing, the wait while fresh concrete gains strength before you put weight on it. If your garage is cut into a slope and the dirt beside it is pushing in, I can look at concrete retaining walls on the same visit.

How do you know your garage floor needs replacing?

A garage floor usually tells you when something's wrong underneath. Here's what I look for when I walk a garage, and what each sign usually means for the slab and the ground it sits on.

  • Cracks that keep widening or run across the whole floor usually mean the base underneath has moved.

  • A floor that's sunk near the door or at one corner usually sits on fill nobody packed.

  • Gray dust that comes up every time you sweep often means the top was finished or cured badly.

  • Water that pools in the middle or runs back toward the house door means the floor wasn't sloped right.

  • Flaking or chipped patches usually point to a weak top layer that's slowly wearing away.

  • A raised edge between sections that catches tires or toes means one part has settled or lifted.

If a crack keeps growing, a section keeps dropping or water keeps getting in, call before it gets worse, because a base that's moving rarely stops on its own.

What happens after you call about a garage floor in Pasadena?

Here's how a garage floor job runs with us, from your first call to the walk-through at the end, so you know who does what and where the city's permit review fits in.

  1. Call or send the form

    Call (626) 345-7318 or send the form, and we'll get back to you to set up a time to look at the floor. Give us a rough idea of the garage size so I know what I'm walking into.

  2. I measure and write it up

    I come out, measure, ask how you'll use the garage and walk you through what I'd do and why, including anything about the base you'd rather not hear. You get a written estimate of the work, so you can weigh it before you decide.

  3. We settle the permit first

    Before any work starts, we sort out who's pulling the permit and put that in writing, and on the ones we pull we handle the paperwork, including the city business license Pasadena asks every contractor pulling permits to show. The city can clear a simple project within its over-the-counter limits in as little as 5 to 10 minutes, while complex plans take about two to four weeks, so that review sets the start date.

  4. We pour, finish and walk it

    Our crew preps the ground, sets the forms, pours and finishes the floor, then cuts the joints and cures it on the schedule we planned. I'm on site to run the job, and at the end I walk the floor with you.

Get a written estimate for your garage floor

Send the form and we'll reply within one business day to set up a visit. I'll come out, measure and give you a free written estimate, with no obligation to go ahead.

Hours
Mon–Fri: 8 AM–11 PM, Sat–Sun: 6 AM–10 PM

Base, vapor barrier and coatings for garage floors

I care most about the subgrade, the packed ground the slab sits on, because nobody sees it after the pour and it's the first thing a budget wants to cut. We dig out soft dirt and pack the base rather than raking it level, and we check where water runs so the floor sheds toward the door. I'll spend your money there before the surface, because a nice finish on a loose base tends to crack anyway.

If you plan to epoxy, paint or cover the floor, tell me at the estimate, because that changes what goes underneath. Concrete industry guidance says the vapor barrier, the sheet under the slab that slows moisture coming up from the ground, should be picked to match whatever goes on top, including how much moisture it lets through. If you're after color or a pattern instead of a coating, that's our decorative concrete work.

Garage floor questions we hear in Pasadena

How much does a new concrete garage floor cost in Pasadena?

A garage floor slab in the Los Angeles area usually costs about $8 to $15 per square foot. That's the going rate in the area, not our price, and where your floor lands depends on the tear-out, the base work, the finish and what goes under it. I'll give you your own figure in a written estimate after I measure.

What is the best finish for a concrete garage floor?

Pick a steel-troweled finish if you want a smooth, hard, dense floor, and a broom finish if you want more grip underfoot. Troweling goes on after the concrete is floated, while brooming happens before it fully hardens, when it's still firm enough to hold the marks. If you wash cars in there or track in a lot of water, I'd take the grip, and I'm glad to walk you through each finishing step.

Why does a new concrete garage floor need joints?

A new floor needs joints so the cracks concrete makes as it shrinks land in straight lines we chose, not wherever they want. A concrete industry standard requires these control joints, the cut lines in the slab, in slabs on the ground, whether they're plain or reinforced with rebar, the steel bars that hold the concrete together. Ask me where they'll go before the pour, and I'll show you on the layout.

Can I pull my own permit for a garage floor in Pasadena?

Yes, Pasadena lets property owners get permits to do the work themselves, but if you then hire unlicensed workers you have to provide workers' compensation insurance, and the city highly recommends hiring a licensed contractor. Applications and fees go to the city's Permit Center at 175 North Garfield Ave. during business hours, and it takes permit and inspection questions at (626) 744-4200. If you plan to do part of the pour yourself, know that fresh concrete left on skin, eyes or clothing can cause severe burns, even third-degree ones.

What causes a new garage floor to crack or get dusty?

Bad timing on the finishing, jointing and curing is a common cause. Concrete industry guidance calls that timing critical, and getting it wrong can lead to cracking, dusting, scaling where the top flakes off, high and low spots and water that won't drain. That's why we plan each step before the truck shows up and keep the pour out of midday heat, which can leave a weak, dusty top.

What kind of contractor pours a garage floor in California?

A concrete contractor pours a garage floor. California's contractor license board describes that trade as forming, pouring, placing, finishing and installing flat and other concrete work, which covers flatwork like floors, driveways and patios. We're licensed and fully insured, and I'm on site to run the job.

Book your garage floor estimate today

Call (626) 345-7318 or use the form with your garage size, the finish you're leaning toward and any coating plans, so I can come out ready to answer your questions on the first visit.

Mon–Fri: 8 AM–11 PM, Sat–Sun: 6 AM–10 PM

(626) 345-7318Request an estimate